Company

Quality Control and Certifications

Inspection flow, measurement and documentation for injection molding projects.

Quality control

Quality is built into the process: incoming material checks, first-article inspection, in-process patrol and final inspection. Inspection records ship with the parts.

Inspection flow

  1. IQC — incoming material and supplier documentation.
  2. First article — critical dimensions and appearance against the drawing.
  3. In-process — patrol checks during molding.
  4. Final — inspection and packing before shipment.

Quality documentation

ISO 9001 and IATF 16949 certified quality systems. Inspection records, material certificates, UL, RoHS and REACH documentation are provided with the quotation.

  • Incoming material checks and supplier documentation
  • First-article inspection against the drawing
  • In-process patrol checks during molding
  • Final inspection and packing before shipment

Documents

Inspection records, material certificates and compliance documents are provided when agreed for the project.

FAQ

Can you provide a PPAP?

PPAP scope depends on the project and the customer’s requirements. Confirm the documentation package before production.

How are critical dimensions checked?

The drawing defines the critical dimensions; the measurement method and acceptance criteria are agreed before production.

About AX Mold → · Custom injection molding → · Ask about quality →

Have a drawing or a target price?

Send the file and the quantity. We will reply with a DFM note and a quote, not a sales deck.

Start an RFQ →