Injection mold tooling

Tooling decisions lock in part cost, cycle time and quality. The earlier they are reviewed, the cheaper the changes.

Tooling decisions that affect part cost

Decision Effect
Cavitation More cavities lower part cost at volume, but raise tool cost and press requirements.
Gate location Affects fill, weld lines, cosmetic marks and cycle time.
Cooling layout Drives cycle time and warp; poor cooling is expensive to fix later.
Steel selection Balances tool life, polishability and cost.
Tolerances Tighter tolerances increase tooling and inspection cost.

Bridge tool vs production tool

Bridge tool Production tool
Use Pilots, trials, market test Series production
Cavitation 1–2 4–8 (typical)
Tool life 50k–100k shots 500k–1M shots
Lead time 3–5 weeks 5–8 weeks
Part cost Higher per part Lower at volume

What to send

Part drawing or 3D file, material, quantity, cavitation preference, target date and assembly requirements. If the design is still developing, send what you have and mark the open questions.

FAQ

Can you review our existing tool design?

Yes. Send the design and the issue you want to solve; we will review feasibility and the likely change scope.

Do you provide mold flow analysis?

Yes. Mold flow analysis is available on request; send the part and the questions you need answered.

Mold manufacturing → · DFM guide → · Discuss tooling →

Company-provided photos. Parts shown are examples, not customer case studies.

Have a drawing or a target price?

Send the file and the quantity. We will reply with a DFM note and a quote, not a sales deck.

Start an RFQ →